============================================================================== Station Notes - Hastings (Pierce Cedar Creek Institute) 06/01/2021: Station / Logger Maintenance: [1500] - routine site maintenance - battery upgrade 05/01/2021: Station Maintenance: [1130] - replaced faulty soil temp (5-cm) [soil0] - replaced soil temp (10-cm) [soil1] sensor - replaced cell modem ============================================================================== 07/03/2019: Logger / Station Maintenance: [1520] - replaced logger (CR1000 -> CR1000) - added PakBus modem - loaded logger program: pcc-bbab 03/26/2019: Logger Maintenance: [1225] - resolved logger / communication issues 03/21/2019: Station Maintenance: [1130] - repaired tipping-bucket rain gauge ============================================================================== 07/27/2018: Station Maintenance: [1320] - annual station / site maintenance 05/24/2018: Station Maintenance: [----] - annual station / site maintenance ============================================================================== 07/24/2017: Station Maintenance: [1400] - annual maintenance, including: - wind vane calibration 06/14/2017: Station Maintenance: [0005] - loaded logger program "pcc-bbaa" 05/30/2017: Station Maintenance: [1745] - annual maintenance, including: - rewired air temp/relh (HMP45C) to "continuous" power ============================================================================== 08/03/2016: Station Maintenance: [1300] - annual maintenance and weed removal ============================================================================== 06/19/2015: Station Maintenance: [1135] - routine station maintenance, including: - cleaned leaf wetness sensors - cleaned tipping-bucket rain gauge - weed removal ============================================================================== 10/10/2014: System Maintenance: [1404] - moved data-collection to new LoggerNet server - loaded logger program "bbaa-tpd" 05/08/2014: Station Maintenance: [1530] - Routine maintenance - cleaned temp/rh sensor ============================================================================== 06/21/2013: Station Maintenance: [1300] - Replaced Soil Temp Sensors (2", 4") - Replaced Air Temp/RH Sensor - Cleaned Leaf Wetness Sensors 06/06/2013: Station Maintenance: [1435] - General station maintenance and system checks, including: - Reinstallation of Soil Temp Probes. - Soil Temp 1 (4") still has some issues and needs additional repair or replacement. ============================================================================== 06/07/2012: Station Maintenance: [1400] - Replaced Modem ============================================================================== 06/02/2009: Station Maintenance: [1700] - General station maintenance and system checks, including: - Tipping-bucket rain gauge test (faulty pcpn data that was introduced was removed on 06/10/09) ============================================================================== 10/20/2008: Data Cleanup: - Faulty 4" soil temperature sensor was replaced at noon on Oct 09, 2008 (d=283). It appears that the sensor sstarted to fail at noon on Sep 08, 2008 (d=252). All 4" soil temperature during the following time period was marked as "missing": 09/08/08 (d=252) 12:00 - 10/09/08 (d=283) 13:00 08/29/2008: Station Online: - Station added to MAWN web site. 08/06/2008: Data Collection Enabled: - Data Collection and Data Archive for new station begins: First data report: Aug 07, 2008 - 00:05 (Day=220) 08/06/2008: Station Maintenance: - Established telecommunication between station cell-modem and data collection PC/server on campus. - Loaded MAWN Program: BBC-PCC B => CR1000 B => CS616 C => Broadband Cell Modem (IP) PCC => Station ID (Hastings) - Now able to collect raw weather data. ==============================================================================