=============================================================================== Station Notes - Shelby-East (MI) 02/23/2026: Station Maintenance: [1130] - resolved communication/sensor/logger issues: - replaced CR6 logger - reload logger program "sbe-bssd.cr6"* * logger needs new internal lithium battery ============================================================================== 06/15/2022: Station Maintenance: [1140] - routine site maintenance, including: - adjusted / cleaned solar panel - checked anemometer (bearings are good) - checked soil sensor cables (good) - checked tipping-bucket rain gauge (good) - checked wind vane (properly aligned) - checked / cleaned pyranometer (adjusted level) - checked / tested battery - checked / tested leaf wetness [stanard] (good)* - cleaned battery box - repaired HygroVue [atmp/relh] (replaced radiation shield] - weed removal (site already in good condition) * site does not include a canopy leaf wetness sensor =============================================================================== 07/21/2021: Station Maintenance: [1340] - routine site maintenance 05/18/2021: Station Maintenance: [1430] - routine site maintenance, including: - modem update =============================================================================== 06/03/2020: Station Maintenance: [1350] - routine site maintenance =============================================================================== 11/27/2019: Station Maintenance: [1340] - replaced battery cable - replaced charge controller 10/28/2019: Logger Maintenance: [1404] - logger issue (CSI helpted to resolve) - reloaded logger program "sbe-bssd" 08/21/2019: Logger Maintenance: [1645] - corrected wiring of 5cm soil sensor - reinstalled leaf wetness 06/12/2019: Station Maintenance: [1445] - install soil sensors (i.e. soil temp/moisture) 04/10/2019: Station Online: [1110] - Station added to Enviroweather/MAWN database system 03/25/2019: Data Collection Enabled [1645] - Data Collection and Data Archive for new station begins: First data report: March 26, 2019 (d=085) 00:05 03/25/2019: Logger Setup [1630] - Loaded MAWN Program: sbe-bssd sbe => Station ID (shelbyeast) b => CR1000/MI (Logger/Site) s => SDI-12 [CS650] (Soil Moisture) s => SDI-12 [HygroVue10] (Temp/RH) d => LWS-L (Leaf Wetness) [no canopy] - Now able to collect raw weather data. 03/25/2019: Station Maintenance: [----] - Established telecommunication between station cell-modem and data-collection PC/server on campus. 03/23/2019: Station Setup [----] - station setup/activated at field site ===============================================================================