fairgrove — Maintenance Reports

Download maintenance log

: Logger Maintenance [1330]

- repaired logger / power issues

: Station Maintenance [1500]

- replaced logger (CR1000 -> CR1000)

- added PakBus modem

- replaced anemometer (wind speed)

- replaced wind vane (wind direction)

- replaced soil sensors

- upgraded atmp/relh (HMP45C -> HMP155A)

- upgraded leaf wetness (237 -> LWS-L) [no canopy]

- loaded logger program: fgv-bbcd

: Logger Maintenance [1205]

- data collection / logger issues:

- reloaded logger program "fgv-bbaa"

: Station Maintenance [1110]

- routine station / site maintenance

: Logger Maintenance [1301]

- loaded new logger program "fgv-bbaa"

: Station Maintenance [1750]

- replaced faulty datalogger (CR10X -> CR1000]

- replaced faulty modem

: Station Maintenance [1200]

- replaced faulty leaf wetness sensors (both)

- replaced atmp/relh sensor (hmp45c)

- reinstalled solar panel

: Station Maintenance [1430]

- replaced faulty tipping-bucket rain gauge

: Station Maintenance [1845]

- power system repair

: Station Maintenance [1445]

- annual maintenance, including:

- tipping-bucket rain gauge repair (obstruction)

: Station Maintenance [1635]

- annual maintenance

: Station Maintenance [1055]

- replaced logger battery

: Station Maintenance [1245]

- replaced logger battery

- cleared snow/ice from solar panel

: Station Maintenance [1125]

- annual maintenance and weed removal

: System Maintenance [1207]

- moved data-collection to new LoggerNet server

- loaded logger program "mawn_abcf"

: Station Maintenance [1400]

- Cleaned solar panel

- Tightened battery connections

: Station Maintenance [1745]

- replace battery

- performed annual routine maintenance

: Station Maintenance [1600]

- Battery / power issues due to corroded battery wire.

: Data Quality [1445]

- Due to recent sensor problems, wind data marked as

"missing" for the following time period:

04/17/2013 (d=107) 0005 - 07/01/2013 (d=182) 1700

: Station Maintenance [1700]

- Logger maintenance / communication correction

- replaced logger

- repalced wind sentry

: Station Maintenance [1200]

- Logger Replaced

- Original Logger Program: ABCF (hourly schedule) loaded

- Due to logger failure, data was lost for the following:

04/17/2013 (d=107) 0005 - 04/19/2013 (d=109) 1200

: Station Maintenance [1245]

- Logger Replaced

- Reloaded Logger Program: ABCF (hourly schedule)

: Station Maintenance [1400]

- Battery Replaced

- Data lost or removed for following several periods between

12/10/2012 - 12/26/2012 due to battery issues.

: Station Maintenance

- Loaded MAWN Program - ABCF (60-minute power cycle) [0001]

: Station Maintenance

- Field Technecians made a site-visit to troubleshoot

wireless communication trouble. As of 14:30 (d=233),

station back online.

: Database Modification

- Added hourly battery voltage (logging of the hourly

voltage data actually started at 1:00am on June 15,

2008 (d=167).

: Station Maintenance

- General station maintenance and system checks, including:

- Convert to wireless broadband (cell-ip)

- Soil Moisture sensors now installed vertically:

- MSTR 0: profile of depth = 0 - 12"

- MSTR 1: profile of depth = 12 - 24"

- Work was done approx: 1200 - 1300 (Day=221)

: Station Maintenance (sm, bn)

- General station maintenance and system checks.

- solar radiation sensor was cleaned.

- Work was done approx: ??.?? - ??.?? (Day=128)

: Station Maintenance: (bn)

- Replaced Modem (COM100). The replacement modem is brand

new and will hopefully improve connection success rates.

[Work done: ~ 15:50]

: Station Maintenance

- Leaf Wetness "A" has been reporting abnormal "WET" periods.

Remote Field Technician was dispatched and the seneck and

clean the sensor.

: Station Maintenance: (crn, jal)

- Replaced Anemometer

- General Station Maintenance and System Checks:

- weed removal and application of Round-Up above soil temps

- tipping bucket rain gauge lid nearly clogged - debris was removed.

- tipping bucket rain gauge checked for accuracy

- Work was done approx: 15:30 - 16:30 (Day=219)

: Data Collection and Data Archive for new station begins

First report: Nov 01, 2003 - 00:05 (Day=305)

: New Station Installed

Notes:

- leaf wetness B (canopy) - still needs to be installed.

- Data Logger Program Loaded: MAWN1C

Additional Station Needs: