: Logger Maintenance [1330]
- repaired logger / power issues

- repaired logger / power issues
- replaced logger (CR1000 -> CR1000)
- added PakBus modem
- replaced anemometer (wind speed)
- replaced wind vane (wind direction)
- replaced soil sensors
- upgraded atmp/relh (HMP45C -> HMP155A)
- upgraded leaf wetness (237 -> LWS-L) [no canopy]
- loaded logger program: fgv-bbcd
- data collection / logger issues:
- reloaded logger program "fgv-bbaa"
- routine station / site maintenance
- loaded new logger program "fgv-bbaa"
- replaced faulty datalogger (CR10X -> CR1000]
- replaced faulty modem
- replaced faulty leaf wetness sensors (both)
- replaced atmp/relh sensor (hmp45c)
- reinstalled solar panel
- replaced faulty tipping-bucket rain gauge
- power system repair
- annual maintenance, including:
- tipping-bucket rain gauge repair (obstruction)
- annual maintenance
- replaced logger battery
- replaced logger battery
- cleared snow/ice from solar panel
- annual maintenance and weed removal
- moved data-collection to new LoggerNet server
- loaded logger program "mawn_abcf"
- Cleaned solar panel
- Tightened battery connections
- replace battery
- performed annual routine maintenance
- Battery / power issues due to corroded battery wire.
- Due to recent sensor problems, wind data marked as
"missing" for the following time period:
04/17/2013 (d=107) 0005 - 07/01/2013 (d=182) 1700
- Logger maintenance / communication correction
- replaced logger
- repalced wind sentry
- Logger Replaced
- Original Logger Program: ABCF (hourly schedule) loaded
- Due to logger failure, data was lost for the following:
04/17/2013 (d=107) 0005 - 04/19/2013 (d=109) 1200
- Logger Replaced
- Reloaded Logger Program: ABCF (hourly schedule)
- Battery Replaced
- Data lost or removed for following several periods between
12/10/2012 - 12/26/2012 due to battery issues.
- Loaded MAWN Program - ABCF (60-minute power cycle) [0001]
- Field Technecians made a site-visit to troubleshoot
wireless communication trouble. As of 14:30 (d=233),
station back online.
- Added hourly battery voltage (logging of the hourly
voltage data actually started at 1:00am on June 15,
2008 (d=167).
- General station maintenance and system checks, including:
- Convert to wireless broadband (cell-ip)
- Soil Moisture sensors now installed vertically:
- MSTR 0: profile of depth = 0 - 12"
- MSTR 1: profile of depth = 12 - 24"
- Work was done approx: 1200 - 1300 (Day=221)
- General station maintenance and system checks.
- solar radiation sensor was cleaned.
- Work was done approx: ??.?? - ??.?? (Day=128)
- Replaced Modem (COM100). The replacement modem is brand
new and will hopefully improve connection success rates.
[Work done: ~ 15:50]
- Leaf Wetness "A" has been reporting abnormal "WET" periods.
Remote Field Technician was dispatched and the seneck and
clean the sensor.
- Replaced Anemometer
- General Station Maintenance and System Checks:
- weed removal and application of Round-Up above soil temps
- tipping bucket rain gauge lid nearly clogged - debris was removed.
- tipping bucket rain gauge checked for accuracy
- Work was done approx: 15:30 - 16:30 (Day=219)
First report: Nov 01, 2003 - 00:05 (Day=305)
Notes:
- leaf wetness B (canopy) - still needs to be installed.
- Data Logger Program Loaded: MAWN1C
Additional Station Needs: